EIPAR

EUROCONTROL Implementation Planning and Reporting

Ensuring strategic alignment of implementation planning at Pan-European level and supporting the monitoring of the ATM Master Plan implementation.

Our Role

EUROCONTROL Implementation Planning and Reporting is based on a collaborative activity to define a set of agreed Implementation Objectives, which upon the agreement of the Network Directors of Operations and Technologies through the Network Manager CDM processes and the approval of the EUROCONTROL Provisional Council form the basis of an annually updated agreed implementation plan. This plan serves as a reference for EUROCONTROL Member States/National Supervisory Authorities (NSAs) to fulfil their roles regarding the supervision of the safe and efficient provision of air navigation services, as well as the timely implementation of the ATM Master Plan.

This unique to the European region approach to implementation planning ensures overall consistency and strategic alignment with the ATM MP 2025, ICAO ASBUs and at the same time, with the SESAR Deployment Programme (SDP) of the SESAR Deployment Manager (SDM).

Progress of implementation is monitored annually through the LSSIP+ Monitoring Cycle at Stakeholder, State and Pan-European levels and aims to feedback results and findings requiring the attention of the decision makers at different levels.

The EUROCONTROL Implementation Plan And Report (EIPAR) document represents the “Implementation view” of the ATM Modernisation for the 42 EUROCONTROL Member States, 2 Comprehensive Agreement states (Israel and Morocco) and MUAC on a given year. It provides an accurate annual picture of the status of implementation of the ATM MP, focusing on the technologies that have an impact on European Network and at the Stakeholders’ implementation site.

EIPAR 2025

This edition is an update of the EUROCONTROL Implementation Plan and Report 2024, providing both planning and reporting information for all monitored Implementation Objectives and, where relevant, providing the link to the ATM MP 2025, SESAR Solutions and to the SESAR Deployment Programme (SDP) for the CP1-related ones.

EIPAR 2025 was reviewed through NM’s Network Directors of Operations (NDOP) and Directors of Technology (NDTECH) consultation process in June 2025.

EIPAR Technical Annex

EIPAR technical Annex contains the full detailed descriptions of all EIPAR 2025 Implementation Objectives, including the new ones, approved by EUROCONTROL Provisional Council (25/08/2025).

The EIPAR 2025 and EIPAR Technical Annex can be downloaded through the link below. 