iNM Wave 2.6 is building on the capabilities introduced in previous iNM releases known as Waves. This new release significantly expands the services available to aeronautical information providers and users, bringing the aviation community closer to the full transition from the legacy EAD system to the eEAD system, accessed through the new NM User Interface (NMUI) and hosted on the iNM Digital Platform, on NM’s mission critical cloud.
iNM Wave-2.6 Release Notes
Wave 2.6 is the next major step in the Network Manager’s iNM Digital Transformation
iNM Wave 2.6 delivers the next major step in the eEAD Transition Roadmap and in the Flight and Flow Services Digital Transformation as part of the iNM Programme.
In practice, Wave 2.6:
- Migrates NM B2B onto the iNM Digital Platform on cloud, no access to the NM B2B onprem after the OPS migration.
- Introduces two new digital products: NMUI Airport, replacing the NM Airport Corner for airports, and NMUI Flight for Pilots, a mobile product giving pilots direct access to their flight, slot and regulation information.
- Makes Support to ARO available on the Ph2 Client Transition Operational Test systems, delivering the ARO flight plan lifecycle (ARO FPL), Pre-flight Information Bulletin services (PIB and eEPIB) and operational meteorological data (OPMET)
- Decommissions NMP Flight (AO) for Aircraft Operators and decommission the NM Airport Corner main services for Airports
- Continues the improvement of NMUI Flight (AO), NMUI Flow, iFF Flow Management and the eEAD products.
Key dates:
- Flight and Flow OPS migration on 1 December, from 21:00 UTC, eEAD OPS migration follows on 2 December from 21:00 UTC.
- Operational Test System active from 27 October, covering the NMUI digital products, NM B2B PREOPS active from 22 October.