The following document provides a step-by-step guide to familiarise with the new map hands-on.
This training can be done anytime, online and at any pace.
The map of the EVITA application contains the latest NM26 release changes and is re-aligned with the latest EVITA User Guide.
The following document provides a step-by-step guide to familiarise with the new map hands-on.
This training can be done anytime, online and at any pace.
For real-time ATFCM problems which require immediate action contact our E-Helpdesk via the Network Operations Portal (NOP). If that is not accessible, please call the Central Flow Helpdesk for assistance:
For real-time operational queries about flight plan messages sent to the IFPS system, please call:
For urgent login, or technical problems (use of access tokens, B2B certificates, transmission, terminals, technical CHMI issues) contact the customer technical service desk and operations (CSO) help desk, please call:
Powered by the Network Manager
Powered by the CRCO
Powered by the Civil-Military Cooperation Division and the Network Manager
Powered by the Maastricht Upper Area Control Centre
Powered by the EUROCONTROL Innovation Hub
Powered by the ALC