The study aimed to investigate issues associated with the implementation of datalink air/ground functionality at the Aix-en-Provence ATC Centre, France, and at the Rome ATC Centre, Italy, in the time frame 2003-2007 using the LINK2000+ datalink services.As part of the study, new controller and pilot functionality was introduced and integrated with a new controller interface based on the EATCHIP III model.
Datalink real-time simulation project
This report describes a EUROCONTROL real-time simulation study conducted on behalf of the EATMP LINK2000+ programme.