A new report providing a first look at ANSP 2025 cost-effectiveness data has been produced by the EUROCONTROL Performance Review Unit. This data has not yet been validated and thus may differ from the information that will be presented in the High-Level Summary Report planned for December 2026 and in the final ACE report in May 2027.
ATM Cost-Effectiveness (ACE): First look at ANSPs' 2025 data
September 2026
EUROCONTROL's Performance Review Unit (PRU) releases a new report with the first look at ANSP's 2025 data.