Event

ECHO 2 Final Dissemination and Close Out Event

ECHO 2 First Dissemination Workshop - event banner

EUROCONTROL is organising the third and final Dissemination Workshop of the ECHO 2 (European Concept of Higher Airspace Operations) project, which will take place on 17-18 December 2026 at the EURCONTROL Headquarters in Brussels.

Download the presentations

ECHO 2 project presentations from Work Package leaders - Solution 1: iNM Space Desk – Prototype & procedure package

Lorenz Losensky, Tobias Rabus, Marta Fernandez Castrillo, Alessandro Bucci, Di Pietrantonio, DLR, DLR, EUROCONTROL, ENAC, HyImpulse

ECHO 2 project presentations from Work Package leaders - Solution 2: HAPS – Procedure package for accommodation/integration in ATM

Andreas Udovic, Alexander Seybold, Stefano Tiberia DFS, DFS, EUROCONTROL

ECHO 2 project presentations from Work Package leaders - Solution 3(0439 & 0558): Supersonic, Hypersonic & Sub-orbital vehicles operation – Procedure package for accommodation/integration with ATM

Fabrizio Arru ENAC

Presentation of Research Activities, LiU

Valentin Polishchuk Linköping University

About ECHO 2

The safe integration of Space Transport Operations (STO) and Higher Altitude Operations (HAO) into air traffic management is becoming an increasingly pressing priority as higher airspace evolves into an active operational domain. Once considered primarily a transition zone between aviation and space, higher airspace is now expected to host a growing range of activities, including commercial space operations, high-altitude platform systems, supersonic and hypersonic aircraft, and suborbital flights. This emerging environment is being shaped by rapid technological development and new commercial opportunities, but it also brings increasing operational complexity linked to launch frequency, re-entry uncertainty, and space debris. 

Within this context, the SESAR ECHO2 three-year project, led by EUROCONTROL, has been supporting the development of new operational capabilities to manage transitions to and from higher airspace more systematically. As space traffic increases and re-entry events and launch activities require more frequent coordination, the need for real-time situational awareness, coordinated decision-making, and robust contingency management becomes central to maintaining safety and efficiency across the wider airspace system.

The project has built on research from the initial ECHO project that developed a concept of operations (ConOps) for higher airspace, focusing on introducing a module on space launch real-time monitoring, and packages covering ground and air-ground operational integration procedures. The project is considered at the forefront of aviation innovation, targeting the end-to-end integration of new entrants - such as space vehicles, HAPS, supersonic, and hypersonic aircraft - into the EUROCONTROL Network Manager area. Through real time simulations and validation flight trials, ECHO2 is demonstrating how air traffic management can be enhanced, whilst ensuring seamless, safe and efficient operations.

This initiative not only supports the growth of modern aviation technologies but also reinforces Europe’s leadership in global aviation progress, paving the way for a future where air and space travel are more integrated than ever.
 

Objectives

This two-day workshop will bring together the higher airspace operations stakeholder community to:

  • showcase the achievements and key outcomes of the ECHO 2 project,
  • present how ECHO 2 results can be further developed and integrated into future Higher Airspace Operations (HAO) initiatives,
  • engage in dialogue on the latest European and international developments,
  • explore evolving market trends,
  • and discuss future ambitions and expectations in Space Traffic Management, HAPS operations, and Supersonic, Hypersonic and Suborbital vehicles.

Agenda

TimeSessionPresenter
09:00 - 09:30Check-in
09:30 - 10:00

Opening and welcome

  • Welcome
  • Workshop approach and agenda
  • Logistics
  • ECHO 2: Setting the scene
  • Keynote speech from SJU
Ovidiu Dumitrache, EUROCONTROL
&
Nil Agacdiken, SJU
10:00 - 11:00
ECHO 2 project presentations from Work Package leaders

Solution 2: HAPS – Procedure package for accommodation/integration in ATM

Solution 2 investigates the integration of High-Altitude Platform Systems (HAPS). Split into 2 areas, the first investigates the climb and descent phase of HAPS from ground to the high-altitude airspace through controlled airspace. Therefore WP 2 developed and validated two different solutions: the dynamic and the static 4D zones. In the dissemination WS the results of the extended real time validation of these 4D zones will be presented. These results will be validated in flight trials next year on Fuerteventura. The second area is the HAPS flights in the high-altitude region. There is a possibility to conduct a (previously planned for 2025) flight trial of AALTO Zephyr next year.  The planned data collection and flight route will be presented during the WS.

Andreas Udovic, DFS 
11:00 - 11:30Coffee break
11:30 - 12:45
ECHO 2 project presentations from Work Package leaders 

Solution 1: iNM Space Desk – Prototype & procedure package

Solution 1 develops the Network Real-time Mission Monitoring tool (N-RMM) and its associated customized operational package as a new service for the EUROCONTROL NMOC to monitor, manage and integrate launching and re-entering space transport operations into European ATM. The project investigates planning processes, operational procedures, and contingency management on a network level and introduces tactically managed Debris Response Areas in Europe. A new working position inside the NMOC, called Space Desk, will be connected via the N-RMM tool with space operators, national and global entities like affected ANSPs, and space data providers. 

Lorenz Lozensky, DLR
12:45 - 14:00Lunch break
14:00 - 15:00

ECHO 2 project presentations from Work Package leaders

Solution 3(0439 & 0558): Supersonic, Hypersonic & Sub-orbital vehicles operation – Procedure package for accommodation/integration with ATM

Solution 0439: Procedural package for the accommodation of A-to-A HTOL suborbital operations in European ATM introduces a procedural package to accommodate A-to-A Horizontal Take-Off and Landing (HTOL) suborbital operations in European ATM, establishing local-level procedures to minimise impact on conventional traffic and network performance. The solution ensures separation from traditional traffic via static and dynamic airspace segregation, including 4D operating zones, and incorporates contingency and emergency procedures to manage mission aborts and potential falling debris, promoting efficient and safe airspace utilisation.

Solution 0558: Procedural package for the integration of supersonic and hypersonic operations in European ATM introduces a procedural package to progressively integrate supersonic and hypersonic operations into European ATM, developing local-level procedures to minimise impact on conventional traffic and network performance. The solution facilitates integration into controlled airspace with increased separation during supersonic flight and addresses non-nominal situations to ensure safety, supporting a sustainable and harmonised implementation of very high-speed HAO across Europe.

Fabrizio Aru, ENAC IT
15:00 - 15:30Coffee break
15:30 - 16:00Presentation of Research Activities, Linköping UniversityValentin Polishchuk, LiU
16:00 - 17:00WISDOME Dome Movie & Tour of exhibitions/facilities
 
17:00 - 17:30Day one wrap-upEUROCONTROL
19:30Gala dinner (Networking & local cuisine)Visualization Centre Restaurant
TimeSessionPresenter/Moderator
09:00 - 09:30Registration and coffee
09:30 - 09:45

Opening and welcome

  • Welcome
  • Day two overview
Ovidiu Dumitrache, EUROCONTROL
09:45 - 11:15

Panel discussions

Setting expectations for Final Phase of ECHO project

  • Regulatory developments
  • Market Evolutions
  • User Cases/Testimonials

Moderator: 
LFV 

Panel Members Composition:
EASA
ENAC IT
EUROCONTROL Network Manager
Spaceport Operator(s)
HAPS ALLIANCE
Space Services Company
Aerospace Company (Hypersonic) 
HAPS Operator
ANSP
 


 

11:15 - 11:45Coffee break
11:45 - 12:15

Panel discussions

Setting expectations for Final Phase of ECHO project

  • Links to ECHO2 solutions
  • Synchronised Challenges
  • Ambitions at European level
     
12:15-12:45Wrap-up and event close 
12:45 - 14:00Lunch break
14:00Event close

Register today!

Photography and video terms
You may revoke your consent at any time. Please read the full Privacy Statement for this event to learn more.
We take data management seriously.
At EUROCONTROL, we manage your data responsibly and do not provide it to third parties. We only use and process your data to answer your question and for quality control purposes. We apply our internal data protection rules, which are aligned with the General Data Protection Regulation, to all of our data-processing. Read the full Privacy Statement for this event to learn more.
Consent
We will email you only occasionally with updates or invitations relating to the themes of this event. You may revoke your consent at any time. Please read the full Privacy Statement for this event to learn more.

Learn more about the ECHO 2 project

Visit the dedicated webpage to learn more about ECHO 2.

ECHO 2 logo

Was this page helpful?