Pessimistic Sector Capacity Estimation

All 2003 reports
 

Abstract

 
This note describes two capacity evaluation methods for ATC sectors. The first method is an improvement of the CAPAN regression method. The second method uses ATCO workload evaluation (microscopic level) linked with complexity impact.
  Acrobat The full report (973 kB)

Authors

 
Flynn, G., Benkouar, A., and Christien, R.

Issue date

 
November, 2003

Language

 
English

Keywords

 
capacity, workload, conflicts, level change, entry flight, complexity

Identifier

 
EEC Technical/Scientific Report No. 2003-026

Also known as

 
EEC Note 2003/21
 
  Author:
Last validation: 20/08/2008