| |
 |
EUROCONTROL Guidance Material for Short Term Conflict Alert (392K) |
 |
General description of the full STCA lifecycle, aimed at staff with responsibility for overall management of STCA.
.
. |
| |
 |
Appendix A: Reference STCA System (706K) |
 |
Detailed technical explanation of typical implementation details of STCA with emphasis on parameterisation and performance optimisation. Optimisation concepts are also covered in detail.
. |
| |
 |
Appendix B: Safety Assurance |
 |
A set of three documents that can be used as starting point for STCA safety assurance work in a particular local context.
. |
| |
 |
Appendix B-1: Safety Argument for STCA System (291K) |
 |
ANSPs may find it convenient to present the safety argument as a stand-alone document initially, as is the case with this document. However, the argument will ultimately become part of the safety case document and the stand-alone version will then become defunct.
. |
| |
 |
Appendix B-2: Generic Safety Plan for STCA Implementation (273K) |
 |
Describes what safety assurance activities should be considered at each lifecycle phase, who should do them, and what the criteria for success are.
.
. |
| |
 |
Appendix B-3: Outline Safety Case for STCA System (445K) |
 |
Addresses in detail the assurance and evidence from the System Definition stage and outlines the likely assurance and evidence for the later stages.
.
. |
| |
 |
Appendix C: Cost Framework for the Standardisation of STCA (287K) |
 |
Assists in identifying potential financial implications of standardisation of STCA in compliance with the EUROCONTROL Specification for Short Term Conflict Alert.
.
. |
| |
 |
Appendix C: Supporting Spreadsheet (1.6M) |
 |
.
.
. |
| |
 |
Appendix D: Case Study |
 |
A set of two documents describing the (partial) application of the optimisation and safety assurance guidance material in a demanding environment.
. |
| |
 |
Appendix D-1: Optimisation of STCA for ATCC Semmerzake (843K) |
 |
Identifies potential solutions for handling military formation flights and a large number of primary tracks in STCA whilst keeping the number of nuisance alerts to an effective minimum.
. |
| |
 |
Appendix D-2: Functional Hazard Assessment of STCA for ATCC Semmerzake (371K) |
 |
Describes the Functional Hazard Assessment of the identified potential solutions for optimisation of STCA, performed as initial step of safety assurance activities. |
 |
 |
The above guidance material together with supplementary information (demonstrator, workshop presentations and articles) can be found here:
|
| |
 |
 |
|
Last validation: 31/03/2009
|
|
|
|
 |
|