Extranet access

EUROCONTROL offers a wide range of online services to stakeholders through its "One Sky Online" extranet portal. Participate in our many working groups, get the latest data on European ATM, or access advanced operational applications all in one click. Register now!

Member Login

 
 PHARE Home
 PHARE Overview
 Concepts
 Experimental Flight Management System
 Datalink
 Ground Human Machine Interface
 Airborne Human Machine Interface
 PHARE Advanced Tools
 Operational Concepts
 PHARE Demonstrations
PHARE Demonstration 1
PHARE Demonstration 1+
PHARE Demonstration 1++
PHARE Demonstration 2
PHARE Demonstration 2+
PHARE Demonstration 3
 Common Modular Simulator
 Experimental Design
 Training
 Validation
 Library
 

PHARE Demonstrations

PHARE Logo
The Demonstrations were large scale validation activities comprising integrated ground systems, air systems and air-ground data link facilities. Demonstration work comprised preparation of the ground and air sites (trials and simulated aircraft) and the integration of the advanced tools.

PHARE Demonstration 1 and PHARE Demonstration 2 investigated ATM in the year 2000 to 2005 timeframe, whereas PHARE Demonstration 3 was concerned with issues in the timeframe 2005-2015.

PHARE Demonstration 1 (PD/1)

The actual trials of PHARE Demonstration 1 were carried out in 1995 and concentrated on the en-route issues by simulating several en-route sectors and entry/exit conditions at TMA sectors. PHARE Demonstration 1 was hosted by DRA at Malvern.
  Further information on PHARE Demonstration 1
PHARE Demonstration 1 was supplemented by two follow-on activities, PHARE Demonstration 1+ and PHARE Demonstration 1++ which provided input to the PHARE Demonstration 3 project.
  Further information on PHARE Demonstration 1+
  Further information on PHARE Demonstration 1++

PHARE Demonstration 2 (PD/2)

PHARE Demonstration 2 addressed the terminal approach issues by simulating several sectors of an extended TMA and emulating entry and exit conditions at en-route sectors. PHARE Demonstration 2 was hosted by DLR at Braunschweig. The trials were run at the end of 1996.
  Further information on PHARE Demonstration 2
PHARE Demonstration 2 was supplemented by a follow-on activity, PHARE Demonstration 2+ which provided input to the PHARE Demonstration 3 project.
  Further information on PHARE Demonstration 2+

PHARE Demonstration 3 (PD/3)

PHARE Demonstration 3 was planned to demonstrate multi-sector, multi-centre en-route and extended TMA planning issues in the timeframe 2005 to 2015. PHARE Demonstration 3 was hosted by CENA, NLR and EEC. PHARE Demonstration 3 also carried out three internal operational clarification projects directed at issues connected with:
  • Multi-Sector planning;
  • Human centred automation and;
  • En-route TMA interfacing.
A final set of demonstrations were run in 1998, building upon the experience obtained in PHARE Demonstration 1 and PHARE Demonstration 2. The PHARE Demonstration 3 Demonstration at CENA specifically demonstrated the departure and en-route integration phase. The Demonstration at NLR was focused on the en-route integration with arrivals and PHARE Demonstration 3 at EEC was intended to investigate the entire en-route phase from end of departure phase to the beginning of arrival phase demonstrating the use of multi-sector planning.
  Further information on PHARE Demonstration 3

PHARE Video

The video entitled "PHARE - A Path to Future Air Traffic Management" was presented at the PHARE Forum in June 1999. It is the last of a series of 4 videos that were produced during the PHARE Programme.
  PHARE video132,145 Kb