|
|
|
|
The Demonstrations were large scale validation activities comprising integrated ground systems, air systems and air-ground data link facilities. Demonstration work comprised preparation of the ground and air sites (trials and simulated aircraft) and the integration of the advanced tools.
PHARE Demonstration 1 and PHARE Demonstration 2 investigated ATM in the year 2000 to 2005 timeframe, whereas PHARE Demonstration 3 was concerned with issues in the timeframe 2005-2015.
|
 |
 |
PHARE Demonstration 1 (PD/1) |
The actual trials of PHARE Demonstration 1 were carried out in 1995 and concentrated on the en-route issues by simulating several en-route sectors and entry/exit conditions at TMA sectors. PHARE Demonstration 1 was hosted by DRA at Malvern.
| |
 |
Further information on PHARE Demonstration 1 |
 |
 |
PHARE Demonstration 1 was supplemented by two follow-on activities, PHARE Demonstration 1+ and PHARE Demonstration 1++ which provided input to the PHARE Demonstration 3 project.
| | | |