Extranet access

EUROCONTROL offers a wide range of online services to stakeholders through its "One Sky Online" extranet portal. Participate in our many working groups, get the latest data on European ATM, or access advanced operational applications all in one click. Register now!

Member Login

 
 LINK 2000+ Home
 Implementing Rule
 Overview
 Airlines
 ANSPs
Operational Benefits
Implementing Rule
Implementation Process & Support
Validation & Interoperability Testing
Guidance Material
Controller Mock-ups
 Library
 News
 Events
 FAQ
 History
 SESAR
 Working Arrangements
 Monitoring & Statistics
 Contact Us
 Related Links
 

Implementation Process and Support

Link 2000+

Key Dates for ANSPs

 By this date all LINK Region (ANSPs) must have implemented an operational compliant system (see the yellow region on the map).
By this date all EU Region ANSPs must have implemented an operational compliant system (see the pink region on the map).
Regions of Applicability (click for a larger image)

EUROCONTROL Support

During the implementation process the stakeholders may need support or clarifications with regard to operational, technical and/or institutional aspects. To meet that demand, EUROCONTROL will provide the following support:

1. Maintenance of the EUROCONTROL Specification and associated standards.
  EUROCONTROL Specification
2. The Link Integration Team (LIT) and the Link Operational Focus Group (OFG), to address all Stakeholders’ implementation issues: operational, technical, safety and testing.
  LIT
  OFG
3. The LINK 2000+ Test Facility, to support problem investigation and stakeholders in technical and interoperability tests. It may also support applicants in certification and operational approval tests.
  LINK 2000+ Test Facility
4. The Central Reporting Office, to report and monitor CPDLC, ATN and VDL Mode 2 operations and performance.

5. The Programme Support Office, to administer and monitor aircraft operator equipage plans, ANSP implementation plans, incentives scheme and exemption cases.

6. Safety Case Development for individual ANSPs.

Data Collection

ANSPs can now communicate their implementation plans and support requirements to the LINK Team through a web-based tool. This will enable quick data collection and report generation from all the ANSPs concerned.

  Data collection questionnaire Access to this link is only for registered contact persons from the various ANSPs

Documents


Local Safety Case Template

This document is both a Safety Case (SC) redaction guide and a Safety Case template aimed at the implementation of Air Ground Data Link (AGDL) system at a local level.

WinZip EN  -  Local Safety Case  -  390 KB
Acrobat EN  -  Safety Case Development Manual  -  482 KB
Proposed Issue: 06/01/2006 Edition: 0.3
 
  Last validation: 24/06/2009