Extranet access

EUROCONTROL offers a wide range of online services to stakeholders through its "One Sky Online" extranet portal. Participate in our many working groups, get the latest data on European ATM, or access advanced operational applications all in one click. Register now!

Member Login

 
 FASTI Home
 What is FASTI?
 Awareness & Communication
 Co-ordination & Implemenation Support
Operational Implementation
FASTI Demonstrator
Simulations & Trials
ATS Systems
Human Factors
Safety & Regulatory Requirements
Business Case
Working Arrangements
 Operational Deployment
 Operational Trials
 AMAN
 Newsletters
 News
 Events
 Documents
 Acronyms & Abbreviations
 Glossary
 FAQ
 Contact
 

Operational Implementation

Objective

The main objective of the Operational Implementation activity is to produce guidance material and support the operational implantation of the FASTI controller tools.

What has happened?

An Operational Concept for FASTI has been produced this provides a common target concept for FASTI.

It contains information on:
  • Operating Principles
  • Environment
  • Assumptions and dependencies
  • Working methods
  • Implementation issues
  • Current local implementations
The ATC Manual of Operations (Implementation Guidelines) has been produced which provides guidelines for ANSPs, ATM related industry (system providers) and regulators, for the implementation of MTCD, MONA and SYSCO in a coordinated way ensuring common operating procedures and interoperability between ATC centres within the ECAC area.

The FASTI demonstrator has been developed to demonstrate in a visual and interactive way the operation of the FASTI tools set and communicate the FASTI operational concept.
  FASTI demonstrator
Also a number of validation activities have been undertaken to validate the FASTI Operational Concept which include:
  Fast Time Simulations
  Real Time Simulations
Technical and Operational validation activities include:
  Project North
  Project South
  SYSCO
  Tactical Controller Tools

Plans

TCT will be validated over the coming years and the results together with experience of working with ANSPs will be used to update the documents.

Documents


FASTI Operational Concept

This concept outlines the scope of FASTI application, assumptions, dependencies and operational environments as well as descriptions of controller roles and working methods, required for the successful operational implementation of conflict prediction tools (e.g. MTCD) and enablers (e.g. MONA, TP, HMI and SYSCO).

The target audience of this document is operational personnel, airspace and ATM system planners, Human Factors and Safety practitioners and operational focus groups.

Acrobat EN  -  Operational Concept  -  1.73 MB
Released: 20/03/2007 Edition: 1.1
Author: Bogdan Petricel and Christy Costelloe

FASTI ATC Manual - Guidelines for FASTI Tools Implementation

The FASTI objective is to coordinate the implementation and deployment of controller system support and tools, as required, across ECAC by 2012 in a harmonised way. The FASTI ATC Manual is provided as a guideline for ANSPs, ATM related industry (system providers) and regulators, for the implementation of MTCD, MONA and SYSCO in a coordinated way ensuring common operating procedures and interoperability between ATC centres within the ECAC area.

Acrobat EN  -  ATC Manual  -  1.54 MB
Released Issue: 15/01/2009 Edition: 1.0
Author: Christy Costelloe & Bogdan Petricel

For further information please contact

Mr Bogdan PETRICEL
Email: 
Work :  +32 2 729 3362
 
  Last validation: 17/06/2010