To ensure that the ESP is implemented as a pan European Programme in an acceptable timeframe the following dates have been agreed.
|
|
 |
 |
|
 |
 |
Formal closure of the Strategic Safety Action Plan (SSAP) |
Formal closure of the Strategic Safety Action Plan (SSAP). A resounding success with only a very small percentage of work carried over into the ESP
|
 |
 |
Third European ATM safety maturity Study |
Annual ATM Safety Maturity Survey distributed to ECAC States ANSPs and ATM Regulators. Results used to analyse and measure the success of SSAP and provide a baseline for ESP.
|
 |
 |
Launch of the European Safety Programme |
Formal Launch of the European Safety Programme. Implementation is underway and will run until the finish line in December 2008.
|
 |
 |
SSAP Post Implementation Safety Evaluation |
SSAP Post Implementation Safety Evaluation reporting to the EUROCONTROL Provisional Council. Final assessment and evaluation of SSAP.
|
 |
 |
Mid-Implementation Progress Assessment Evaluation |
A formal report to the EUROCONTROL Provisional Council providing a mid-point assessment of the progress and effectiveness of ESP implementation.
|
 |
 |
Target Implementation Date |
A formal report to the EUROCONTROL Provisional Council providing the final assessment of ESP implementation.
|
 |
 |
ESP Post Implementation Safety Evaluation |
ESP Post Implementation Safety Evaluation reporting to the EUROCONTROL Provisional Council. Final assessment of ESP implementation. Review of any outstanding actions and necessary follow-on activities.
|
 |