Future Communications Infrastructure (FCI)


Future Communications Infrastructure (FCI)


WIMAX Profile for Airport Surface Communications
Acrobat WIMAX Profile for Airport Surface Communications
Released: 30/09/2009 Edition: 1.3
Author: Eurocontrol

Deliverables S1-S7
Acrobat L-Band Interference Scenarios
Released: 25/08/2009 Edition: 1.0
Author: Helios

C1 Deliverable
Acrobat Compatibility criteria and test specification for DME
Released: 24/08/2009 Edition: 1.0
Author: Helios

C2 Deliverable
Acrobat Compatibility criteria and test specification for UAT
Released: 24/08/2009 Edition: 1.0
Author: Helios

C3 Deliverable
Acrobat Compatibility criteria and test specification for SSR Systems
Released: 24/08/2009 Edition: 1.0
Author: Helios

C4 Deliverable
Acrobat Compatibility criteria and test specification for GSM/UMTS900
Released: 24/08/2009 Edition: 1.0
Author: Helios

C5 Deliverable
Acrobat Compatibility criteria and test specification for GNSS
Released: 24/08/2009 Edition: 1.0
Author: Helios

C6 and S6 Deliverables
Acrobat Compatibility Criteria (C6) and Interference Scenarios (S6) for RSBN
Released: 24/08/2009 Edition: 1.0
Author: Helios

LDACS2 D3 Deliverable v1.2
Acrobat LDACS2 Design D3 v1.2
Released: 18/06/2009 Edition: v1.2
Author: EGIS AVIA

C7 Deliverable
Acrobat Assessment on the potential use of the onboard suppression bus for L-DACS operation
Released: 15/05/2009 Edition: 1.0
Author: Helios

D3 Deliverable
Acrobat D3 Deliverable
Released: 27/04/2009 Edition: 1.0
Author: Frequentis, DLR, University of Salzburg, and Selex

LDACS2 D1 Draft Deliverable v0.34
Acrobat LDACS2 D1 Draft Deliverable v0.34
Working Draft: 11/03/2009 Edition: 0.34
Author: EGIS AVIA

LDACS1 D2 Final Deliverable v10
Acrobat LDACS1_D2 Deliverable_Spec Proposal_v10
Released: 13/02/2009 Edition: 1.0
Author: Frequentis, DLR, University of Salzburg, and Selex

Certification Cost Estimation for FCI Platform
Acrobat Certification Cost Estimation for FCI Platform
Released: 29/01/2009 Edition: 1.1 Issue 1
Author: Rockwell Collins

Draft B-AMC Frequency Plan
Acrobat Draft B-AMC Frequency Plan
Released: 27/03/2008 Edition: 1.0
Author: University of Salzburg

DME and B-AMC Coexistence Study Report
Acrobat DME and B-AMC Coexistence Study Report
Released: 28/02/2008 Edition: 2.0
Author: Roke Manor

Proposed L-Band Interference Scenarios
Acrobat Proposed L-Band Interference Scenarios: Proposed L-Band Interference Scenarios
Released: 04/02/2008 Edition: 1.0
Author: DLR

Systematic Interference Investigations
Acrobat Systematic Interference Investigations
Released: 31/01/2008 Edition: 1.0
Author: DLR

Action Plan 17 Final Report

Action Plan 17 - Final Conclusions and Recommendations Report, EUROCONTROL/FAA/NASA.

Acrobat Action Plan 17 Final Report
Date: 01/11/2007 Edition: v1.1

FCI - Step 2 Technology Assessment Results

Future Communications Infrastructure – Step 2 Technology Assessment Results, EUROCONTROL, version 1.0, October 2007

Acrobat FCI - Step 2 Technology Assessment Results
Date: 29/10/2007 Edition: v1.0

B-AMC Project Deliverable D4
Acrobat B-AMC Project Deliverable D4: B-AMC Interference Analysis and Spectrum Requirements
Released: 22/10/2007 Edition: 1.1
Author: Frequentis

B-AMC Project Deliverable D5
Acrobat B-AMC Project Deliverable D5: Expected B-AMC System Performance
Released: 24/09/2007 Edition: 1.1
Author: DLR

B-AMC Project Deliverable D2.2
Acrobat B-AMC Project Deliverable D2.2: B-AMC Operating Concept and Deployment Scenarios
Released: 24/08/2007 Edition: 1.0
Author: Frequentis

B-AMC Project Deliverable D2.1
Acrobat B-AMC Project Deliverable D2.1: B-AMC System High Level Description
Released: 17/08/2007 Edition: Issue 1.0
Author: Frequentis

B-AMC Project Deliverable D6
Acrobat B-AMC Project Deliverable D6: B-AMC Aircraft Integration and Ground Infrastructure
Released: 17/08/2007 Edition: 1.0
Author: Frequentis

B-AMC Project Deliverable D1
Acrobat B-AMC Project Deliverable D1: DME Spectrum Characterisation
Released: 14/08/2007 Edition: Draft 1.0
Author: Mileridge

B-AMC Project Deliverable D3
Acrobat B-AMC Project Deliverable D3: B-AMC Specification
Released: 14/08/2007 Edition: Rev 1.0
Author: DLR

AMACS Description v1.0
Acrobat AMACS Description
Date: 02/07/2007 Edition: v1.0
Author: Eurocontrol

Communications and Operating Concept Document

Communications and Operating Concept Document, FAA/EUROCONTROL, version 2.0, May 2007.

Acrobat EN  -  Communications and Operating Concept Document
Date: 01/05/2007 Edition: v2.0

Technology Investigations: Evaluation Scenarios Document

FCI – Technology Investigations: Evaluation Scenarios Document”, EUROCONTROL/FAA, version 1.0, April 2007.

Acrobat EN  -  Technology Investigations: Evaluation Scenarios Document
Date: 01/04/2007 Edition: v1.0