SES Performance Scheme Reference Period 2 (2015-2019)

Status of development of RP2

Before the start of the first reference period, preparations had started for the second reference period.

The SES Performance Scheme for RP2 has been adopted and published by the Commission:

The Commission has published the EU-Wide performance targets for RP2: 2015-2019 in the Official Journal of the European Union. By 1 July 2014 FABs/ Member States have submitted their Performance Plans to the Commission. The PRB has assessed these plan in line with the Regulations and has adviced the Commission on their findings.

  • Following the SSC/55 the EC published their EC Decision 2015/347 concerning the inconsistency of certain targets included in the national or functional airspace block plans submitted pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the second reference period and setting out recommendations for the revision of those targets. Also they published their
  • EC Decision 2015/348 concerning the consistency of certain targets included in the national or functional airspace block plans submitted pursuant to Regulation (EC) No 549/2004 of the European Parliament and of the Council with the Union-wide performance targets for the second reference period.

 

 

 

Preparations

RP2: Preparations

PRB workshop on the implementation of the SES performance scheme, 8th May 2013

 Please find here the slides as presented:

 For all those interested the workshop has been filmed. Please link to the website of the EC Mobility DG.

KPIs and PIs in the revised SES Performance Scheme regulation

The revised performance and charging Regulations were adopted on 8 March 2013 and will be published soon in the Official Journal of the European Union.
Annex I of the revised performance Regulation lists the KPIs and PIs that are applicable from RP2 onwards. You will find here a summary table (in a format similar to the one published in the PRB's proposed regulatory approach document) providing the full list of RP2 KPIs and PIs.

PRB Report - preparation of the revision of the SES Performance Scheme addressing RP2 and beyond

This report presents the PRB’s advice to the European Commission regarding the revision of the performance scheme of the second Single European Sky package. The recommendations contained in this document are supporting the Commission’s work on the amendment of Regulation (EU) No 691/2010 (the performance Regulation) and Regulation (EU) No 1191/2010 (the charging Regulation).

Outcome of the Public consultation on the regulatory approach for RP2

During the period from 16 March 2012 ending 8 June 2012, the Commission held a public consultation on the proposed regulatory approach for a revision of the SES performance scheme addressing the second reference period (RP2) and beyond. The commission has received 65 questionnaire replies, resulting in more than 500 pages of raw input. The PRB has condensed this into a Summary of Responses document.

On 19th June 2012 the PRB workshop on RP2 of the performance scheme took place

Please find here the slides of the speakers.

Public consultation on the regulatory approach for RP2

Peter Griffiths, the PRB Chairman has announced the start of the public consultation on the proposed regulatory approach (pdf) for the revision of the Single European Sky performance scheme. Please find here his letter (pdf).

The consultation ran for the general public for a period of 12 weeks. All details could be found on the European Commission's website which contained a on-line questionnaire as well. As a tool for the drafting, internal circulation and review of your answers, an editable MS-Word version of the questionnaire was provided.

The Commission had received 65 questionnaire replies, resulting in more than 500 pages of raw input. The PRB has condensed these materials into a Summary of Responses document

State of preparations RP2 (End Nov 2011)

These slides (pdf) show the state of play, as at end-November 2011, of the Performance Scheme of the SES (slides 1-3) as well as the preparations for RP2 (slides 4 onwards).

Informal workshop on RP2 (10 Nov 2011)

The PRB started the preparations for the SES RP2 performance scheme with a stakeholder consultation at EUROCONTROL on 10 November 2011.

The relevant documentation for this workshop was as follows:

 

EU wide performance targets

Written consultation on EU-wide performance targets 2015-2019

Following its stakeholder workshop, held on 6 February, the Performance Review Body (PRB) has prepared a document on Union-wide (EU) performance targets for the second Reference Period of the Single European Sky Performance scheme (RP2, 2015-2019).

The consultation runs from 17 May-03 July inclusive. Stakeholders are invited to provide comments using the Commission's questionnaire.

Both the PRB document and the EC questionnaire are available here.

Please note that the PRB document serves as background to assist you in responding to the Commission's questionnaire, which in fact constitutes the consultation mechanism.

Any queries relating to the PRB document should be addressed to the Performance Review Unit: RP2-Support@eurocontrol.int .

All Stakeholders' comments will be considered by the PRB when preparing its report on EU-wide targets for RP2, which will be sent to the Commission in early-September 2013.

PRB workshop on the EU-wide performance targets for RP2

On the 6th of February 2013 from 10:00 till 16:00, the PRB organised an informal workshop on the ranges for the EU-wide performance targets for RP2 (2015-2019) in the Conference Center of the European Commission with a view to exchange views and get stakeholders' expectations in terms of performance targets.

Please find here:

The video of the workshop can be seen here.

 

EC Decision on RP2 Targets

The Commission has published the EU-Wide performance targets for RP2: 2015-2019 in the Official Journal of the European Union:

Performance Plans for RP2

Performance Plans for RP2

The table below assembles the official FAB Performance Plans including Annexes and in some cases an official Corrigendum and the corresponding PRB assessments. Currently only the FAB plans which the are consistent with the Union-wide performance targets in all four key performance areas are published here (see EU 2015/348 of 2 March 2015).

 

FAB FAB Performance Plans & PRB assessment
UK-IE 

Initial Plan
Annexes
PRB Assessment
Amendments
Revised PRB Assesment

DK-SE

Initial Plan
Annexes
Amendments
PRB Assessment

BALTIC

Initial Plan
Annexes-1
Annexes-2
Amendments
PRB Assessment

NEFAB

Initial Plan
Annexes
Amendments
PRB Assessment

The Network Manager’s (NM) approved Network Performance Plan (NPP) was received on 13 November 2014. The body responsible for endorsing the NPP before submission to the European Commission is the Network Management Board (NMB). In accordance with Article 14 of the Performance Regulation 390/2013 [Ref. iii] the PRB has assessed the NPP on the basis of the criteria laid down in Annex IV of Regulation 390/2013.

Tagged under: 

Share this