Extranet access

EUROCONTROL offers a wide range of online services to stakeholders through its "One Sky Online" extranet portal. Participate in our many working groups, get the latest data on European ATM, or access advanced operational applications all in one click. Register now!

Member Login

 
 Homepage
 Filing Flight Plans
 Route Charges
 Avionics Requirements
 Registering Your Fleet
 Contact Us
 

Filing Flight Plans


This page povides a quick reference on how to submit a Flight Plan to the Initial Flight Plan Processing System (IFPS), view related reference manuals and access the Central Flow Management Unit (CFMU) applications supporting Aircraft Operators.

Which Flight Plans must you send to the CFMU, Initial Flight Plan Processing System?

Any flight plan with an Instrument Flight Rules (IFR) component (IFR/GAT or IFR/VFR) within the Initial Plan Processing System (IFPS) airspace.

Which areas does IFPS airspace cover?

  CFMU Areas of Operation

When to File flight Plans?

  • FPLs MAY be filed 5 days before Estimated Off Blocks Date
  • FPLs MUST be filed 1 hour prior to departure unless Air Traffic Flow Capacity Management (ATFCM) measures are in effect, then they MUST be filed 3 hours prior to departure

How does the CFMU process your flight plans?

Aircraft Operators send the Flight Plan (FPL) to the IFPS:
  • Which acknowledges receipt
  • Processes the data
  • Stores it in the CFMU database
  • Sends and distributes the information to the Air Traffic Control and Capacity Managment (ATC) units which will be concerned with the flight

Flight Plans with Errors

Fligh Plans (FPLs) containing errors or inconsistencies are referred for manual processing by an Initial Flight Plan Processing System (IFPS) operator, who will handle each individual case according to specified procedures and may refer back to the originator if appropriate.

Test File your Flight Plans – reduce errors – improve rate of automated processing

Flight Plans may be submitted to the IFPUV dedicated test system via the Network Operations Plan (NOP) Public Portal, and then selecting 'IFPUV' from the Tactical or PreTactical phases. For more information on the IFPUV, please consult the FAQ related to the IFPUV.
  HTML Network Operations Plan (NOP) Public Portal
  HTML IFPUV FAQ

Flight Planning Reference Manuals

Air Traffic Flow and Capacity Management (ATFCM) Manual provides an operational description of the CFMU Air Traffic Flow and Capacity Managment procedures & related actions, information and message exchange.

Initial Flight Plan Processing System (IFPS) Manual contains all the Procedures and information necessary for operators to be able to construct, transmit or when necessary correct, flight plan and and associated update messages.
  CFMU Library

Access to online CFMU Applications and Services

Online applications for assisting your interaction with CFMU are available and are described through the following link:
  CFMU Applications Access
How to get access is described in the Step by Step Guide:
  Step-by-Step Guide For Accessing the CFMU Applications

For additional help or queries

  CFMU Contacts and Assistance


Contact:

CFMU Customer Support
Email: 
 
  Last validation: 15/10/2009